Rainscreen conversion case study

Rainscreen cladding conversion for a change of use

A £350,000 principal-contractor project replacing combustible PUR-insulated panels and missing fire barriers before a commercial property could be converted into residential flats.

Project
Commercial property conversion to flats
Brief
Fire-safe rainscreen cladding replacement
Value
£350,000
Programme
Delivered within budget
Commercial property façade after the rainscreen cladding conversion
Commercial property façade during the rainscreen conversion
Before After

Rainscreen conversion · Drag to compare the façade works and completed cladding

Drag the divider to compare before and after.

01

Survey finding and project brief

The existing façade used combustible PUR-insulated panels and had no fire barriers. The proposed conversion to flats could not proceed with that system in place, so the cladding needed full replacement and a documented fire-safe build-up.

02

Principal-contractor delivery

TCR acted as Principal Contractor, coordinating the façade survey, design, specification, procurement, planning and building-control liaison, site setup, health and safety, access, installation quality assurance, final inspection and handover.

03

Fire-safe rainscreen system

The replacement build-up used a Fastframe support system, non-combustible Rockwool Rainscreen DuoSlab insulation, open-state cavity barriers and James Hardie HardiePanel fibre-cement cladding. The design combined fire performance, moisture management and a modern architectural finish.